• The Juniper facility will be a Normally Unmanned Installation (NUI) and will take gas from the Corallita and Lantana fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet.
• The development will include five subsea wells and will have a production capacity of approximately 590 million standard cubic feet a day (mmscfd).
• Gas from Juniper will flow to the Mahogany B hub via a new ten kilometer flow line.
• BPTT operates in 904,000 acres off Trinidad’s east coast.

