Dorado SS5 Low IR troubleshoot

Members of our team performed condition monitoring on the Dorado Field off of Marlin TLP in the gulf of Mexico and identified signs of impending failure of a Subsea power line feeding the field which was a daisy chained development and carried high risks for hydrates.  The early indication of the impending failure gave the operator 9 months to plan and optimize the intervention which permitted the use of vessels that had white space instead of using emergency vessels. There was a an attributed value of roughly  4 million dollars in savings credited to the early detection.